Stories
Slash Boxes
Comments

SoylentNews is people

posted by mrpg on Monday July 19 2021, @02:00AM   Printer-friendly
from the hydrogen,-why-not dept.

Siemens Mobility to test hydrogen train on Bavarian rail route:

Siemens Mobility has signed a memorandum of understanding (MoU) to test a hydrogen-powered train in the German state of Bavaria.

The company signed the MoU with the state government of Bavaria and local railway company Bayerische Regiobahn (BRB) to conduct the trial.

The two-car train will begin test runs from mid-2023 on the Augsburg – Füssen route and will enter passenger services in January 2024.

The pilot operations will initially run for 30 months. During this period, the train will be stationed in Augsburg.

The train is being developed on the basis of Siemens Mobility's Mireo Plus H platform. The vehicle will have a range of up to 800km and will be capable of running on non-electrified rail lines.

As primary modules of the hydrogen traction drive, two fuel cells will be placed on the train's roof. The system will utilise the newest generation of batteries from the Saft company that will be deployed beneath the floor.


Original Submission

 
This discussion has been archived. No new comments can be posted.
Display Options Threshold/Breakthrough Mark All as Read Mark All as Unread
The Fine Print: The following comments are owned by whoever posted them. We are not responsible for them in any way.
  • (Score: 0) by Anonymous Coward on Monday July 19 2021, @03:08PM

    by Anonymous Coward on Monday July 19 2021, @03:08PM (#1157887)

    i think it's a "half-assed" problem. ofc it gets mathematically when comparing infinities but if you have a infinite energy SOURCE (and infra to gather it, duh) then storing it and releasing it again even at crazy bad efficiencies of say ... oh ... ah ... 1% is still infinite.
    the problem is that germany might not have natural gas or lithium but has potential to gather from an infinite source and use a abundant available storage medium, that is water.
    ofc, methinks "just stringing" a overhead wire would be the simplest way?

    then again, and here i am on limb, yes, maybe if you add the two together, that is the train had accesd to an overhead line AND a tank of water with an electrolyzer it could, maybe, "go faster then the wind"?